Intelligent BIM services for efficient project delivery.
Commercial Office Tower
Full-scope architectural and MEP BIM modeling for a 42-story commercial tower, delivering clash-free coordination and fabrication-ready documentation.
Project Scope
is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since 1966, when designers at Letraset and James Mosley, the librarian at St Bride Printing Library, took a 1914 Cicero translation and scrambled it to make dummy text for Letraset’s Body Type sheets. It has survived not only many decades, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised thanks to these sheets and more recently with desktop publishing software including versions of Lorem Ipsum.
Challanges
- The Metropolis Transit Hub involved a complex intersection of heavy rail, bus terminals,
and underground retail. The primary challenge was the multi-discipline coordination of
high-density MEP systems within a heritage structural framework. - Zero-tolerance clash detection between new MEP and existing structural columns.
- Managing 15+ sub-consultant models in a unified BIM environment.
Advanced BIM modeling for a modern transit hub.
.BIM Solutions
Unified Revit Ecosystem
Developed a master architectural, structural, and MEP model to act as the single source of truth for all trades.
Advanced Navisworks Scripts
Automated clash reporting cycles every 48 hours, significantly reducing human error in identification.
LOD 400 Fabrication Data
Provided contractors with fabrication-ready models, enabling off-site pre-assembly for 40% of critical components.