Back to Case studies
Intelligent BIM services for efficient project delivery.
Industrial Plant Retrofit
Laser scan to as-built BIM conversion for a legacy manufacturing facility, enabling accurate renovation planning without disrupting production.
Project Scope
Location
Chicago, IL
Timeline
14 Months
Standard
Chicago, IL
Challanges
- The Metropolis Transit Hub involved a complex intersection of heavy rail, bus terminals,
and underground retail. The primary challenge was the multi-discipline coordination of
high-density MEP systems within a heritage structural framework. - Zero-tolerance clash detection between new MEP and existing structural columns.
- Managing 15+ sub-consultant models in a unified BIM environment.
Advanced BIM modeling for a modern transit hub.
.BIM Solutions
Unified Revit Ecosystem
Developed a master architectural, structural, and MEP model to act as the single source of truth for all trades.
Advanced Navisworks Scripts
Automated clash reporting cycles every 48 hours, significantly reducing human error in identification.